H.R. 7551 · 117th Congress · House

Housatonic Wild and Scenic River Act of 2022

Active· Referred to the House Committee on Natural Resources.
Introduced
Apr 21, 22
Passed House
Pending
Passed Senate
Pending
Sent to President
Pending
Signed into Law
Pending

Executive Summary

Housatonic Wild and Scenic River Act of 2022

This bill designates specified segments of the Housatonic River in Connecticut as components of the National Wild and Scenic Rivers System.

The designation of the river segments must not impact or alter the existing terms of permitting, licensing, or operation of

  • the Falls Village Hydroelectric Generating Station located in Falls Village, Connecticut, or
  • the Bulls Bridge Hydroelectric Generating Station located in New Milford, Connecticut.

The designation of the river segments must also not preclude the Federal Energy Regulatory Commission from licensing, relicensing, or otherwise authorizing the operation or continued operation of those facilities.

The authority of the Department of the Interior to acquire lands for the river segments shall be

  • limited to acquisition by donation or acquisition with the consent of the owner, and
  • subject to the additional criteria set forth in the Housatonic River Management Plan.

No land or interest in land may be acquired for the river segments by condemnation.

Action Timeline

3
  1. APR 21, 2022IntroReferral

    Introduced in House

  2. APR 21, 2022IntroReferral

    Introduced in House

  3. APR 21, 2022IntroReferral

    Referred to the House Committee on Natural Resources.

Committees

1

Natural Resources Committee

hsii00

Referred: Apr 21, 2022

Active